/
dhananjay tiwari
Verifieddhananjay tiwari
Public Preview Kushinagar •2 Authorities•54 Bids
Bid Lifecycle DistributionBy ₹ Value
₹2.3 Cr
₹15.7 Cr
Won (2)
₹2.3 CrFinance Rej (3)
₹15.7 CrTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹2.3 Cr
9 won
Win Rate
16.7%
Avg. Deal: ₹25.1 L
Avg. Bid Size
₹34.1 L
across 54 tenders
Total Bids
54
state tenders
Annual Performance & Win Trajectory
12.3% Won
Value Captured: ₹2.3 Cr
Pool: ₹18.4 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 37 tenders | 9 wins | 24.3% | ₹2.3 Cr |
| 2025 | 17 tenders | 0 wins | 0% | ₹0 |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Kushinagar
18 bids (3 won)
₹1.4 Cr
Won contracts KUSHINAGAR
30 bids (4 won)
₹53.2 L
Won contracts DEORIA
5 bids (2 won)
₹33.7 L
Won contracts SE, Ayo/Ambd Circle, PWD, Ayodhya
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | dhananjay tiwari Won Value ↕ |
|---|---|---|---|---|---|
1 M/S RAMESH RAI #1 Arch-Rival Split outcome in shared bids | 16 shared | 2 Won | ₹22.6 L | ₹54.6 L 2 won | |
2 RAJENDRA KUMAR JAISWAL #2 Major Rival | 10 shared | 0 Wins | ₹0 | ₹0 0 won | |
3 M/S ARADHYA ENTERPRISES Split outcome in shared bids | 9 shared | 1 Won | ₹65.8 L | ₹16.0 L 1 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Patch repair work on MDR/ODR category roads within Development Block Padrauna, under the Padrauna Assembly Constituency.↗ 1988/7A DATE 18-06-2026 · 2026-07-14T12:00:00 Chief Engineer Gorakhpur Zone PWD Gorakhpur UP KUSHINAGAR | ₹10.2 L | ₹8.6 L -15.5% vs est. | ₹8.6 L ★dhananjay tiwari | 1 | ACCEPTED - AOC |
| Patch repair work on MDR/ODR category roads within the Sevarhi Development Block, under the Tamkuhi Assembly Constituency.↗ 1988/7A DATE 18-06-2026 · 2026-07-14T12:00:00 Chief Engineer Gorakhpur Zone PWD Gorakhpur UP KUSHINAGAR | ₹10.2 L | ₹8.6 L -15.3% vs est. | ₹8.6 L ★dhananjay tiwari | 2 | ACCEPTED - AOC |
| Patch repair work on rural category roads within Development Block Dudahi, under the Fazilnagar Assembly Constituency.↗ 1988/7A DATE 18-06-2026 · 2026-07-14T12:00:00 Chief Engineer Gorakhpur Zone PWD Gorakhpur UP KUSHINAGAR | ₹10.2 L | ₹8.7 L -15.2% vs est. | ₹8.7 L M/S RAMESH RAI | 2 | REJECTED - FINANCE |
| Renewal of Chakdeiya to Bhiswa via Semra Jhugwa Road -ODR- in Dist Kushinagar↗ 1241/76yat-Deo Circle/26 Dated 17.03.2026 · 2026-03-25T15:00:00 Chief Engineer Gorakhpur Zone PWD Gorakhpur UP Kushinagar | ₹42.3 L | ₹37.0 L -12.6% vs est. | ₹31.7 L Vishwanath Pati Tiwari | L2 | REJECTED - FINANCE |
| Renewal of Link Road from Parsauna Pitch to Ojha Tala to Bharwalia Ghera Tola in Dist Kushinaga↗ 1243/76yat-Deo Circle/26 Dated 17.03.2026 · 2026-03-25T15:00:00 Chief Engineer Gorakhpur Zone PWD Gorakhpur UP Kushinagar | ₹38.4 L | ₹31.5 L -18% vs est. | ₹27.7 L Vishwanath Pati Tiwari | L4 | REJECTED - FINANCE |
Contractor Ledger Preview • Showing 5 of 54 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.