/
UDAY ENGINEERS
VerifiedUDAY ENGINEERS
Public Preview banda •1 Authorities•16 Bids
Bid Lifecycle DistributionBy ₹ Value
₹1.3 Cr
₹3.0 Cr
Won (2)
₹1.3 CrFinance Rej (0)
₹3.0 CrTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹1.3 Cr
4 won
Win Rate
30.8%
Avg. Deal: ₹33.3 L
Avg. Bid Size
₹46.8 L
across 16 tenders
Total Bids
16
state tenders
Annual Performance & Win Trajectory
17.8% Won
Value Captured: ₹1.3 Cr
Pool: ₹7.5 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 10 tenders | 3 wins | 30% | ₹1.1 Cr |
| 2025 | 5 tenders | 0 wins | 0% | ₹0 |
| 2023 | 1 tenders | 1 wins | 100% | ₹20.8 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Sukhro Weir in District Bijnaur.
1 bids (1 won)
₹68.6 L
Won contracts banda
4 bids (2 won)
₹43.9 L
Won contracts Baghelkhand Dam
1 bids (1 won)
₹20.8 L
Won contracts Bareilly
2 bids (0 won)
₹0
Unawarded Harewali
2 bids (0 won)
₹0
Unawarded at Gopalpur in district Firozabad .
1 bids (0 won)
₹0
Unawarded district Bulandshahar .
1 bids (0 won)
₹0
Unawarded Kushinagar
1 bids (0 won)
₹0
Unawarded Gomti Barrage in District Lucknow.
1 bids (0 won)
₹0
Unawarded Kemri Barrage in District Rampur .
1 bids (0 won)
₹0
Unawarded haridwar
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | UDAY ENGINEERS Won Value ↕ |
|---|---|---|---|---|---|
1 NIRMAL ENGINEERS #1 Arch-Rival Split outcome in shared bids | 9 shared | 1 Won | ₹76.9 L | ₹89.3 L 2 won | |
2 S K ENGINEERING WORKS #2 Major Rival Split outcome in shared bids | 7 shared | 2 Won | ₹43.9 L | ₹1.1 Cr 3 won | |
3 swastik traders Split outcome in shared bids | 6 shared | 1 Won | ₹15.5 L | ₹90.3 L 2 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Dismantling, Shifting of old shutter assembly and carriage, Assembling, Erection of new shutter assembly of 04 nos cross regulator gates...↗ 15/SE/IWC1K/2026-2027, Lot-03 · 2026-09-10T02:32:00 U P Irrigation Department (Mechanical) at Gopalpur in district Firozabad . | ₹50.6 L | — | Pending | — | UNDER EVALUATION |
| Dismantling, Shifting of old shutter assembly and Assembling, Erection of new shutter assembly of 23 nos other way gates of...↗ 15/SE/IWC1K/2025-26, Lot-02 · 2026-08-20T12:30:00 U P Irrigation Department (Mechanical) district Bulandshahar . | ₹1.4 Cr | — | Pending | — | UNDER EVALUATION |
| Dismantling, Shifting of old shutter assembly and Carriage, Assembling, Erection of new shutter assembly of 03 nos cross reulator gates...↗ 15/SE/IWC1K/2026-2027, Lot-01 · 2026-08-20T12:20:00 U P Irrigation Department (Mechanical) Kushinagar | ₹1.3 Cr | — | Pending | — | UNDER EVALUATION |
| Erection of 2nd stage of Embedment parts Shutter Assembly, Stanchion leg of Escape Regulator at km 18.259 of Ken Main...↗ 02/WM/2026-2027 · 2026-04-13T10:00:00 U P Irrigation Department (Mechanical) banda | Not Disclosed | ₹21.7 L 0% vs est. | ₹21.7 L ★UDAY ENGINEERS | L1 | ACCEPTED - AOC |
| Erection of Superstructure and Lifting Assembly,Central drive Unit of Attara Branch Cross Regulator at km 59.338 Trijunction of Tail of...↗ 02/WM/2026-2027 · 2026-04-13T10:00:00 U P Irrigation Department (Mechanical) banda | Not Disclosed | ₹22.2 L 0% vs est. | ₹22.2 L ★UDAY ENGINEERS | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 16 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.