/
SMT Vidya devi
VerifiedSMT Vidya devi
Public Preview Pilibhit •2 Authorities•8 Bids
Bid Lifecycle DistributionBy ₹ Value
₹30.4 L
₹52.8 L
Won (2)
₹30.4 LFinance Rej (3)
₹52.8 LTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹30.4 L
3 won
Win Rate
37.5%
Avg. Deal: ₹10.1 L
Avg. Bid Size
₹10.4 L
across 8 tenders
Total Bids
8
state tenders
Annual Performance & Win Trajectory
36.6% Won
Value Captured: ₹30.4 L
Pool: ₹83.0 L
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 8 tenders | 3 wins | 37.5% | ₹30.4 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Amethi
4 bids (2 won)
₹17.4 L
Won contracts SULTANPUR
3 bids (1 won)
₹13.0 L
Won contracts Sultanpur
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | SMT Vidya devi Won Value ↕ |
|---|---|---|---|---|---|
1 M/S J P CONSTRUCTION #1 Arch-Rival Split outcome in shared bids | 4 shared | 2 Won | ₹18.8 L | ₹17.4 L 2 won | |
2 M/S ARUN KUMAR TIWARI #2 Major Rival | 2 shared | 2 Won | ₹14.0 L | ₹0 0 won | |
3 M/s Abbas Ali | 1 shared | 1 Won | ₹18.5 L | ₹0 0 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Upgradation of Composite School Amnaikpur Block Karaudikala Distt. Sultanpur↗ 657/E E/Ayo/E-Tender/Composit School/2026- 27 Dated 17.06.2026 · 2026-06-18T09:00:00 U.P. State Construction and Infrastructure Development Corporation Ltd. Sultanpur | Not Disclosed | ₹18.7 L 0% vs est. | ₹18.5 L M/s Abbas Ali | L2 | REJECTED - FINANCE |
| Renwal work Mana Patti (Dihwa) to Barchawal link road↗ 1005/2A/2025-26 Date-06.03.2026 · 2026-03-15T09:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹7.0 L | ₹7.0 L 0% vs est. | ₹6.7 L M/S ARUN KUMAR TIWARI | L2 | REJECTED - FINANCE |
| Renwal work Dikhauli to Baijapur Link Road↗ 1005/2A/2025-26 Date-06.03.2026 · 2026-03-15T09:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹12.8 L | ₹13.0 L +1.8% vs est. | ₹13.0 L ★SMT Vidya devi | L1 | ACCEPTED - AOC |
| Renwal work Rampurkhurd Thakur Basti link road↗ 1005/2A/2025-26 Date-06.03.2026 · 2026-03-14T17:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹7.4 L | ₹7.4 L +0.7% vs est. | ₹7.2 L M/S ARUN KUMAR TIWARI | L3 | REJECTED - FINANCE |
| Under the MLC Develepment Fund Construction of C C Roads 185.00 Metres at Block Shukul Bazar Dist Amethi↗ 587/E E/Ayo/E Tender/MLA Amethi/25-26 09.01.2026 · 2026-01-31T14:50:00 U.P. State Construction and Infrastructure Development Corporation Ltd. Amethi | Not Disclosed | ₹8.7 L 0% vs est. | ₹8.7 L ★SMT Vidya devi | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 8 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.