/

SHREE BAJRANG DEV INFRASTRUCTURE

SHREE BAJRANG DEV INFRASTRUCTURE

Public Preview
Amethi •1 Authorities•11 Bids
Bid Lifecycle DistributionBy ₹ Value
₹6.3 Cr
₹1.0 Cr
Won (2)
₹6.3 Cr
Finance Rej (3)
₹1.0 Cr
Tech/Scrutiny (0)
₹0
Outbid/Other (0)
₹0
Awarded Value
₹6.3 Cr
8 won
Win Rate
72.7%
Avg. Deal: ₹78.9 L
Avg. Bid Size
₹74.2 L
across 11 tenders
Total Bids
11
state tenders

Annual Performance & Win Trajectory

77.4% Won
Value Captured: ₹6.3 Cr
Pool: ₹8.2 Cr
Fiscal YearTenders ContestedContracts WonAnnual Win RateWon Value (INR)
2026 10 tenders 7 wins 70% ₹5.4 Cr
2025 1 tenders 1 wins 100% ₹88.2 L

Geographic Operating Footprint

Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Amethi
11 bids (8 won)
₹6.3 Cr
Won contracts

Client Government Organisations

1 Clients
Primary Awarding Authorities (1)
#1 UPPWD Chief Engineer PWD Faizabad Zone
8 won of 11 bids
₹6.3 Cr
100% share
Contractor revenue captured: ₹6.3 Cr of ₹6.3 Cr (100%)

Competitor Intelligence Radar

Competitor Entity ↕
Shared Tenders ↓
Rival Wins ↕
Rival Won Value ↕
Head-to-Head Duel
SHREE BAJRANG DEV INFRASTRUCTURE Won Value ↕
1
Satya Dev Mishra #1 Arch-Rival
5 shared 0 Wins ₹0
₹3.2 Cr
5 won
2
R K Construction #2 Major Rival
3 shared 3 Won ₹99.0 L
₹0
0 won
3
Ayodhya Associates
1 shared 0 Wins ₹0
₹88.2 L
1 won
Showing Top 3 Competitors (Capped Public Preview)

Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.

Tender History & Bid Outcomes

Tender & Authority
Estimate ↕
Contractor Quote ↕
Winning Quote ↕
RankOutcome Status
Repair works for the approach road and protective structures of the minor bridge over the local drain located at Km...↗
2378/14A/2026 Dt 13.05.2026 · 2026-05-23T09:00:00
Chief Engineer PWD Faizabad Zone
Amethi
₹16.0 L
₹16.0 L
-0.3% vs est.
₹15.9 L
R K Construction
L2 REJECTED - FINANCE
Approach road and protective works for the minor bridge over the local drain located at Km 2 on the Gauriganj...↗
2378/14A/2026 Dt 13.05.2026 · 2026-05-23T09:00:00
Chief Engineer PWD Faizabad Zone
Amethi
₹15.0 L
₹15.0 L
-0.1% vs est.
₹15.0 L
R K Construction
L2 REJECTED - FINANCE
Construction of Lugri Kaudihar to Pure Gautam link road including 5 years of maintenance↗
1967/1com-Sul.A.Cir./2026-27 Dt 14.05.2026 · 2026-05-22T17:00:00
Chief Engineer PWD Faizabad Zone
Amethi
₹69.0 L
₹68.1 L
-1.3% vs est.
₹68.1 L
R K Construction
L2 REJECTED - FINANCE
Repair work on the pre-existing minor bridge approach roads and protective structures situated at Km 01 on the Kadunala Musafirkhana...↗
1958 /1com-Sul.A.Cir./2026-27 Dt 14.05.2026 · 2026-05-22T17:00:00
Chief Engineer PWD Faizabad Zone
Amethi
₹80.0 L
₹79.9 L
-0.2% vs est.
₹79.9 L
★SHREE BAJRANG DEV INFRASTRUCTURE
L1 ACCEPTED - AOC
Repair work on the minor bridge approach roads and protective structures situated over a local drain at Km 10 on...↗
1958 /1com-Sul.A.Cir./2026-27 Dt 14.05.2026 · 2026-05-22T17:00:00
Chief Engineer PWD Faizabad Zone
Amethi
₹36.5 L
₹35.6 L
-2.4% vs est.
₹31.1 L
★SHREE BAJRANG DEV INFRASTRUCTURE
L1 ACCEPTED - AOC
Contractor Ledger Preview • Showing 5 of 11 Tenders

Historical Tender Ledger Capped

Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.