/
SHREE BAJRANG DEV INFRASTRUCTURE
VerifiedSHREE BAJRANG DEV INFRASTRUCTURE
Public Preview Amethi •1 Authorities•11 Bids
Bid Lifecycle DistributionBy ₹ Value
₹6.3 Cr
₹1.0 Cr
Won (2)
₹6.3 CrFinance Rej (3)
₹1.0 CrTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹6.3 Cr
8 won
Win Rate
72.7%
Avg. Deal: ₹78.9 L
Avg. Bid Size
₹74.2 L
across 11 tenders
Total Bids
11
state tenders
Annual Performance & Win Trajectory
77.4% Won
Value Captured: ₹6.3 Cr
Pool: ₹8.2 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 10 tenders | 7 wins | 70% | ₹5.4 Cr |
| 2025 | 1 tenders | 1 wins | 100% | ₹88.2 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Amethi
11 bids (8 won)
₹6.3 Cr
Won contracts Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | SHREE BAJRANG DEV INFRASTRUCTURE Won Value ↕ |
|---|---|---|---|---|---|
1 Satya Dev Mishra #1 Arch-Rival | 5 shared | 0 Wins | ₹0 | ₹3.2 Cr 5 won | |
2 R K Construction #2 Major Rival | 3 shared | 3 Won | ₹99.0 L | ₹0 0 won | |
3 Ayodhya Associates | 1 shared | 0 Wins | ₹0 | ₹88.2 L 1 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Repair works for the approach road and protective structures of the minor bridge over the local drain located at Km...↗ 2378/14A/2026 Dt 13.05.2026 · 2026-05-23T09:00:00 Chief Engineer PWD Faizabad Zone Amethi | ₹16.0 L | ₹16.0 L -0.3% vs est. | ₹15.9 L R K Construction | L2 | REJECTED - FINANCE |
| Approach road and protective works for the minor bridge over the local drain located at Km 2 on the Gauriganj...↗ 2378/14A/2026 Dt 13.05.2026 · 2026-05-23T09:00:00 Chief Engineer PWD Faizabad Zone Amethi | ₹15.0 L | ₹15.0 L -0.1% vs est. | ₹15.0 L R K Construction | L2 | REJECTED - FINANCE |
| Construction of Lugri Kaudihar to Pure Gautam link road including 5 years of maintenance↗ 1967/1com-Sul.A.Cir./2026-27 Dt 14.05.2026 · 2026-05-22T17:00:00 Chief Engineer PWD Faizabad Zone Amethi | ₹69.0 L | ₹68.1 L -1.3% vs est. | ₹68.1 L R K Construction | L2 | REJECTED - FINANCE |
| Repair work on the pre-existing minor bridge approach roads and protective structures situated at Km 01 on the Kadunala Musafirkhana...↗ 1958 /1com-Sul.A.Cir./2026-27 Dt 14.05.2026 · 2026-05-22T17:00:00 Chief Engineer PWD Faizabad Zone Amethi | ₹80.0 L | ₹79.9 L -0.2% vs est. | ₹79.9 L ★SHREE BAJRANG DEV INFRASTRUCTURE | L1 | ACCEPTED - AOC |
| Repair work on the minor bridge approach roads and protective structures situated over a local drain at Km 10 on...↗ 1958 /1com-Sul.A.Cir./2026-27 Dt 14.05.2026 · 2026-05-22T17:00:00 Chief Engineer PWD Faizabad Zone Amethi | ₹36.5 L | ₹35.6 L -2.4% vs est. | ₹31.1 L ★SHREE BAJRANG DEV INFRASTRUCTURE | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 11 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.