/
SACHIN SINGH
VerifiedSACHIN SINGH
Public Preview NP Guladiya •3 Authorities•34 Bids
Bid Lifecycle DistributionBy ₹ Value
₹98.3 L
₹3.0 Cr
Won (3)
₹98.3 LFinance Rej (2)
₹3.0 CrTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹98.3 L
9 won
Win Rate
26.5%
Avg. Deal: ₹10.9 L
Avg. Bid Size
₹12.2 L
across 34 tenders
Total Bids
34
state tenders
Annual Performance & Win Trajectory
23.7% Won
Value Captured: ₹98.3 L
Pool: ₹4.1 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 29 tenders | 6 wins | 20.7% | ₹83.8 L |
| 2025 | 5 tenders | 3 wins | 60% | ₹14.5 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Budaun
21 bids (7 won)
₹38.8 L
Won contracts EE RED Bulandshahr
3 bids (1 won)
₹34.1 L
Won contracts EE RED BSR
1 bids (1 won)
₹25.4 L
Won contracts NP Guladiya
9 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | SACHIN SINGH Won Value ↕ |
|---|---|---|---|---|---|
1 M/S YOGENDRA CONSTRUCTION #1 Arch-Rival | 14 shared | 9 Won | ₹1.5 Cr | ₹0 0 won | |
2 shree ji m k builders #2 Major Rival | 14 shared | 0 Wins | ₹0 | ₹17.7 L 3 won | |
3 JAGMOHAN SINGH CONTRACTOR | 9 shared | 0 Wins | ₹0 | ₹0 0 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| New construction and asphalt paving work from the Harjipura Canal up to Dirora Vishwanathpur.↗ 1843/RED/Tender-File/2025-26 Dt. 31-03-2026 · 2026-04-25T18:00:00 Director Cum Chief Engineer RED EE RED Bulandshahr | ₹38.1 L | ₹38.1 L -0.1% vs est. | ₹38.0 L ASHOK KUMAR SINGH | L2 | REJECTED - FINANCE |
| Construction of a drainage channel in Village Badarpur, extending from Harishchandra enclosure to Horam enclosure↗ 1843/RED/Tender-File/2025-26 Dt. 31-03-2026 · 2026-04-25T12:00:00 Director Cum Chief Engineer RED EE RED Bulandshahr | ₹14.4 L | ₹14.4 L -0.1% vs est. | ₹14.3 L ASHOK KUMAR SINGH | L2 | REJECTED - FINANCE |
| New construction and asphalt paving work on the Anupshahr-Karnwas road to Nagla Talwar road stretch.↗ 1843/RED/Tender-File/2025-26 Dt. 31-03-2026 · 2026-04-25T12:00:00 Director Cum Chief Engineer RED EE RED Bulandshahr | ₹34.2 L | ₹34.1 L -0.2% vs est. | ₹34.1 L ★SACHIN SINGH | L1 | ACCEPTED - AOC |
| Construction of interlocking pavers and a drainage channel in Village Boda, from Arjun house to the Shiva Temple↗ 1843/RED/Tender/ 2025-26/Dt 31/03/26 · 2026-04-16T12:00:00 Director Cum Chief Engineer RED EE RED BSR | ₹25.5 L | ₹25.4 L -0.3% vs est. | ₹25.4 L ★SACHIN SINGH | L1 | ACCEPTED - AOC |
| Work of supply of Grit at departmental hot mix plant (Located near Kachla Ghat, Km 133, Bareilly Mathura road) for...↗ 960(1)/Nivida/2025-26 dt 30/03/2026 · 2026-04-09T18:55:00 Cheif Engineer Bareilly Zone PWD Bareilly Budaun | ₹10.0 L | ₹6.6 L -34.5% vs est. | ₹6.6 L ★SACHIN SINGH | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 34 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.