/
Raj Kumar Verma
VerifiedRaj Kumar Verma
Public Preview HARDOI •1 Authorities•111 Bids
Bid Lifecycle DistributionBy ₹ Value
₹1.6 Cr
₹16.8 Cr
₹64.8 L
Won (1)
₹1.6 CrFinance Rej (3)
₹16.8 CrTech/Scrutiny (1)
₹64.8 LOutbid/Other (0)
₹0Awarded Value
₹1.6 Cr
13 won
Win Rate
11.7%
Avg. Deal: ₹12.0 L
Avg. Bid Size
₹17.4 L
across 111 tenders
Total Bids
111
state tenders
Annual Performance & Win Trajectory
8.1% Won
Value Captured: ₹1.6 Cr
Pool: ₹19.3 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 81 tenders | 11 wins | 13.6% | ₹1.2 Cr |
| 2025 | 30 tenders | 2 wins | 6.7% | ₹39.5 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
HARDOI
104 bids (13 won)
₹1.6 Cr
Won contracts EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM)
7 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | Raj Kumar Verma Won Value ↕ |
|---|---|---|---|---|---|
1 RAJ KUMAR PAL #1 Arch-Rival Split outcome in shared bids | 10 shared | 6 Won | ₹53.5 L | ₹26.1 L 3 won | |
2 M/S J.M.V. CONSTRUCTION #2 Major Rival | 3 shared | 1 Won | ₹19.0 L | ₹0 0 won | |
3 DEVENDRA KUMAR | 2 shared | 2 Won | ₹23.8 L | ₹0 0 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Patch repair work on rural roads under Sandila block in Hardoi district for the financial year 2026-27↗ 809/M-11/E-TENDER/2026 DT- 12.03.2026 · 2026-03-23T12:00:00 Chief Engineer PWD Central Zone,Lucknow HARDOI | ₹20.0 L | ₹20.0 L -0.1% vs est. | ₹19.9 L RAJ KUMAR PAL | L2 | REJECTED - FINANCE |
| Construction work of Small bridge of 3x2 m span at chainage 0-950 of Sarra Madhiya to Sukhwa Link Road↗ 695/10 MG / 2026 DATE 12.03.2026 · 2026-03-21T12:00:00 Chief Engineer PWD Central Zone,Lucknow EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) | ₹29.0 L | ₹24.8 L -14.6% vs est. | ₹21.2 L M/S MITHLESH KUMAR TIWARI | L7 | REJECTED - FINANCE |
| Construction work of 3x2 span RCC box culvert at change 0-075 of Kolo link road from CNN Road↗ 695/10 MG / 2026 DATE 12.03.2026 · 2026-03-21T12:00:00 Chief Engineer PWD Central Zone,Lucknow EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) | ₹23.5 L | ₹21.3 L -9.4% vs est. | ₹19.0 L M/S J.M.V. CONSTRUCTION | L4 | REJECTED - FINANCE |
| Renewal with General Repair of Shahbuddinpur to Barra link road in Km-1 to 4(300)↗ 1016M/1MT/ E-TENDER/U.C./25-26 DATE 28.02.2026 · 2026-03-11T09:00:00 Chief Engineer PWD Central Zone,Lucknow HARDOI | Not Disclosed | ₹35.4 L 0% vs est. | ₹35.4 L ★Raj Kumar Verma | L1 | ACCEPTED - AOC |
| Construction of Behtagokul Link Road Village Kheriya to Tidhaupurva via Rohai Atbaha Link Road Missing Link Road↗ 900 /MT / 1MT / E-Tendring / Unnao Circle /2026 Dated - 21.02.2026 · 2026-03-03T12:00:00 Chief Engineer PWD Central Zone,Lucknow HARDOI | ₹64.8 L | — | ₹59.9 L RAJEEV NARAIN | Tech Disqualified | NOT ADMITTED - TECH |
Contractor Ledger Preview • Showing 5 of 111 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.