/
Om Shiv Sai group
VerifiedOm Shiv Sai group
Public Preview SE AYO AMB CIRCLE PWD Ayodhya •1 Authorities•16 Bids
Bid Lifecycle DistributionBy ₹ Value
₹2.9 Cr
₹1.2 Cr
₹1.9 Cr
Won (3)
₹2.9 CrFinance Rej (1)
₹1.2 CrTech/Scrutiny (1)
₹1.9 CrOutbid/Other (0)
₹0Awarded Value
₹2.9 Cr
10 won
Win Rate
62.5%
Avg. Deal: ₹29.4 L
Avg. Bid Size
₹45.9 L
across 16 tenders
Total Bids
16
state tenders
Annual Performance & Win Trajectory
40% Won
Value Captured: ₹2.9 Cr
Pool: ₹7.3 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 1 tenders | 0 wins | 0% | ₹0 |
| 2025 | 15 tenders | 10 wins | 66.7% | ₹2.9 Cr |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
SE AYO AMB CIRCLE PWD Ayodhya
4 bids (4 won)
₹1.4 Cr
Won contracts SULTANPUR
4 bids (3 won)
₹1.3 Cr
Won contracts EE CD3 PWD Ayodhya
6 bids (3 won)
₹30.6 L
Won contracts office of the se.ayo.ambe.circle.pwd.ayodhya
1 bids (0 won)
₹0
Unawarded SE, Ayo/Ambd Circle, PWD, Ayodhya
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | Om Shiv Sai group Won Value ↕ |
|---|---|---|---|---|---|
1 M/S V.K. CONSTRUCTION #1 Arch-Rival | 5 shared | 0 Wins | ₹0 | ₹1.2 Cr 4 won | |
2 RUDRA KAMAL CONSTRUCTIONS #2 Major Rival | 3 shared | 3 Won | ₹12.3 L | ₹0 0 won | |
3 M/S MUMREJ CONSTRUCTION | 3 shared | 0 Wins | ₹0 | ₹1.0 Cr 3 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Widening and strengthening Work of Block Bikapur Headquarters link road in Ayodhya district↗ 7788/2com ayo-ambe-circle/2025 dt. 31.12.2025 · 2026-01-16T17:30:00 Chief Engineer PWD Faizabad Zone office of the se.ayo.ambe.circle.pwd.ayodhya | ₹1.9 Cr | — | ₹1.4 Cr M/S RAKESH PRATAP SINGH | Tech Disqualified | REJECTED - TECHNICAL |
| Construction of Khajurahat Milkipur km 21 to Mahesh ka purwa via UP Vidhayalay Ranapur Link Road↗ 6690/54(I)Com(CD-4)-Ayo/Ambd Circle Dt 14.11.2025 · 2025-12-05T09:00:00 Chief Engineer PWD Faizabad Zone SE, Ayo/Ambd Circle, PWD, Ayodhya | ₹51.5 L | ₹34.0 L -34% vs est. | ₹32.0 L M/S MALTI DEVI CONSTRUCTIONS | L2 | REJECTED - FINANCE |
| Construction of Badgodwa Road to Bankhodwa Link Road in Distt-Ayodhya including 5 Year Maintenance of road↗ 6693/2(1)Com Ayo Amb. Circle/2025 dated 14.11.2025 · 2025-11-21T12:00:00 Chief Engineer PWD Faizabad Zone SE AYO AMB CIRCLE PWD Ayodhya | ₹1.1 Cr | ₹74.3 L -32.4% vs est. | ₹66.3 L ★Om Shiv Sai group | L1 | ACCEPTED - AOC |
| Construction work on the new Gangapur Kuchmuch connecting road under the Lambhua assembly constituency↗ 3626/1Com-Su.A.Cir/2025-26 Date 06.11.2025 · 2025-11-15T09:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹84.0 L | ₹58.8 L -30% vs est. | ₹58.7 L ★Om Shiv Sai group | L1 | ACCEPTED - AOC |
| Special Repair of Mukimpur urf Pahadpur Sampark Marg↗ 6541/2(1)Com Ayo.Amb.Circle/2025 dated 04.11.2025 · 2025-11-11T12:00:00 Chief Engineer PWD Faizabad Zone SE AYO AMB CIRCLE PWD Ayodhya | ₹40.0 L | ₹27.3 L -31.7% vs est. | ₹23.9 L ★Om Shiv Sai group | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 16 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.