/
M/s Sudhir Kumar Maurya
VerifiedM/s Sudhir Kumar Maurya
Public Preview EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) •1 Authorities•8 Bids
Bid Lifecycle DistributionBy ₹ Value
₹27.1 L
₹24.6 L
Won (4)
₹27.1 LFinance Rej (1)
₹24.6 LTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹27.1 L
5 won
Win Rate
62.5%
Avg. Deal: ₹5.4 L
Avg. Bid Size
₹7.2 L
across 8 tenders
Total Bids
8
state tenders
Annual Performance & Win Trajectory
47% Won
Value Captured: ₹27.1 L
Pool: ₹57.7 L
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2025 | 8 tenders | 5 wins | 62.5% | ₹27.1 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM)
8 bids (5 won)
₹27.1 L
Won contracts Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | M/s Sudhir Kumar Maurya Won Value ↕ |
|---|---|---|---|---|---|
1 PECOM SOLUTIONS #1 Arch-Rival | 4 shared | 0 Wins | ₹0 | ₹5.7 L 2 won | |
2 Building Bulls Projects Pvt. Ltd #2 Major Rival | 3 shared | 3 Won | ₹19.4 L | ₹0 0 won | |
3 KOHINOOR CONTRACTOR AND SUPPLIERS | 2 shared | 0 Wins | ₹0 | ₹3.4 L 1 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Special Repair of Paliya Lucknow Road to Ghosar Link Road↗ 2322/10 MG / 2025 DATE 03.11.2025 · 2025-11-20T12:00:00 Chief Engineer PWD Central Zone,Lucknow EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) | ₹7.8 L | ₹6.5 L -17% vs est. | ₹6.5 L ★M/s Sudhir Kumar Maurya | L1 | ACCEPTED - AOC |
| Special Repair of PL Road to Dalel Nagar Link Road↗ 2322/10 MG / 2025 DATE 03.11.2025 · 2025-11-20T12:00:00 Chief Engineer PWD Central Zone,Lucknow EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) | ₹8.0 L | ₹6.5 L -18.1% vs est. | ₹6.4 L Building Bulls Projects Pvt. Ltd | L2 | REJECTED - FINANCE |
| Special repair of Barsati nala 1x2 meter span RCC culvrt at the km 1 of Kahderiya Khajhanpur road↗ 2322/10 MG / 2025 DATE 03.11.2025 · 2025-11-20T12:00:00 Chief Engineer PWD Central Zone,Lucknow EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) | ₹14.2 L | ₹11.6 L -18.3% vs est. | ₹11.6 L ★M/s Sudhir Kumar Maurya | L1 | ACCEPTED - AOC |
| Construction of U Type Drian in Selapur Abadi portion↗ 2322/10 MG / 2025 DATE 03.11.2025 · 2025-11-20T12:00:00 Chief Engineer PWD Central Zone,Lucknow EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) | ₹3.2 L | ₹2.6 L -18.1% vs est. | ₹2.6 L ★M/s Sudhir Kumar Maurya | L1 | ACCEPTED - AOC |
| Construction of U Type Drian in Khalepurwa Abadi portion↗ 2322/10 MG / 2025 DATE 03.11.2025 · 2025-11-20T12:00:00 Chief Engineer PWD Central Zone,Lucknow EXECUTIVE ENGINEER CD-2 PWD HARDOI (HQ-BILGRAM) | ₹3.8 L | ₹3.1 L -19.2% vs est. | ₹3.1 L ★M/s Sudhir Kumar Maurya | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 8 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.