/
JAINUL HASAN THEKEDAR
VerifiedJAINUL HASAN THEKEDAR
Public Preview EE RED Sambhal •3 Authorities•9 Bids
Bid Lifecycle DistributionBy ₹ Value
₹8.5 L
₹50.7 L
₹77.1 L
Won (0)
₹8.5 LFinance Rej (4)
₹50.7 LTech/Scrutiny (1)
₹77.1 LOutbid/Other (0)
₹0Awarded Value
₹8.5 L
1 won
Win Rate
11.1%
Avg. Deal: ₹8.5 L
Avg. Bid Size
₹15.3 L
across 9 tenders
Total Bids
9
state tenders
Annual Performance & Win Trajectory
6.2% Won
Value Captured: ₹8.5 L
Pool: ₹1.4 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 4 tenders | 0 wins | 0% | ₹0 |
| 2025 | 5 tenders | 1 wins | 20% | ₹8.5 L |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
EE RED Sambhal
3 bids (1 won)
₹8.5 L
Won contracts np naugawan sadat
4 bids (0 won)
₹0
Unawarded sambhal
1 bids (0 won)
₹0
Unawarded np naugawna sadat
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | JAINUL HASAN THEKEDAR Won Value ↕ |
|---|---|---|---|---|---|
1 M/S ABIDI CONTRACTOR #1 Arch-Rival | 5 shared | 1 Won | ₹4.0 L | ₹0 0 won | |
2 Mohammad Sadik Contractor #2 Major Rival | 3 shared | 3 Won | ₹36.8 L | ₹0 0 won | |
3 KRISHANA ENTERPRISES | 2 shared | 1 Won | ₹27.7 L | ₹0 0 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Construction of interlocking tiles work↗ 09/N.P.N.S/E-TENDER/2026-27 · 2026-04-15T12:00:00 Directorate of Local Bodies UP np naugawan sadat | ₹12.4 L | ₹12.4 L +0.3% vs est. | ₹12.4 L Mohammad Sadik Contractor | L3 | REJECTED - FINANCE |
| 50 plaes roof top rainwater harvesting work↗ 09/N.P.N.S/E-TENDER/2026-27 · 2026-04-15T12:00:00 Directorate of Local Bodies UP np naugawan sadat | ₹11.9 L | ₹119.1 Cr +100151.8% vs est. | ₹11.9 L Mohammad Sadik Contractor | L3 | REJECTED - FINANCE |
| construction of 11 no. outlet km. 0.000 to km. 3.688 left and right bank of Rajpur Mr. (Lot-08)↗ 03/EE/2025-26 · 2026-02-09T10:00:00 U P Irrigation Department (Civil) sambhal | ₹5.1 L | — | ₹4.3 L MOHD IMRAN CONTRACTOR | Tech Disqualified | REJECTED - TECHNICAL |
| Construction of cc road nali work in ward no↗ 01/N.P.N.S/E-TENDER/2025-26 · 2026-02-07T12:00:00 Directorate of Local Bodies UP np naugawan sadat | ₹14.6 L | ₹14.1 L -3% vs est. | ₹12.5 L Mohammad Sadik Contractor | L4 | REJECTED - FINANCE |
| Construction of cc road and nali work↗ 44/N.P.N.S/E-TENDER/2025-26 · 2025-12-13T12:00:00 Directorate of Local Bodies UP np naugawna sadat | ₹7.8 L | ₹7.9 L +1.2% vs est. | ₹7.6 L CHETAK ENTERPRISES | L4 | REJECTED - FINANCE |
Contractor Ledger Preview • Showing 5 of 9 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.