/
GAYATRI UPADHYAY
VerifiedGAYATRI UPADHYAY
Public Preview Kushinagar •3 Authorities•7 Bids
Bid Lifecycle DistributionBy ₹ Value
₹1.2 Cr
₹42.8 L
Won (4)
₹1.2 CrFinance Rej (1)
₹42.8 LTech/Scrutiny (0)
₹0Outbid/Other (0)
₹0Awarded Value
₹1.2 Cr
4 won
Win Rate
57.1%
Avg. Deal: ₹30.5 L
Avg. Bid Size
₹22.1 L
across 7 tenders
Total Bids
7
state tenders
Annual Performance & Win Trajectory
78.7% Won
Value Captured: ₹1.2 Cr
Pool: ₹1.5 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 5 tenders | 4 wins | 80% | ₹1.2 Cr |
| 2025 | 2 tenders | 0 wins | 0% | ₹0 |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
Kushinagar
3 bids (1 won)
₹70.0 L
Won contracts WARD NO. 19
2 bids (2 won)
₹37.7 L
Won contracts WARD NO. 16
1 bids (1 won)
₹14.3 L
Won contracts WARD NO. 15
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | GAYATRI UPADHYAY Won Value ↕ |
|---|---|---|---|---|---|
1 TRIMURTI CONSTRUCTION #1 Arch-Rival | 4 shared | 0 Wins | ₹0 | ₹52.0 L 3 won | |
2 JAGRITI INFRAVENTURES (OPC) PRIVATE LIMITED #2 Major Rival | 3 shared | 0 Wins | ₹0 | ₹1.1 Cr 3 won | |
3 M/S VIJAY LUXMI CONSTRUCTION Split outcome in shared bids | 2 shared | 1 Won | ₹9.3 L | ₹14.3 L 1 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| Construction of interlocking in Ward No. 16 (Keshav Nagar), extending from Rai Sahib house to Kedar house via Dhuriya Marg.↗ 434/NPPK/2026-27 DATE 30-07-2026 · 2026-08-03T17:00:00 Directorate of Local Bodies UP WARD NO. 16 | Not Disclosed | ₹14.3 L 0% vs est. | ₹14.3 L ★GAYATRI UPADHYAY | 1 | ACCEPTED - AOC |
| Construction of CC road in Ward No. 19 (Shivaji Nagar), from Rambharosa house to Vijay Gautam house via Umesh house.↗ 434/NPPK/2026-27 DATE 30-07-2026 · 2026-08-03T17:00:00 Directorate of Local Bodies UP WARD NO. 19 | Not Disclosed | ₹17.0 L 0% vs est. | ₹17.0 L ★GAYATRI UPADHYAY | 1 | ACCEPTED - AOC |
| Construction of CC road and drain in Ward No. 19 (Shivaji Nagar), from the Secretariat to Ramprasad house via Guptar↗ 434/NPPK/2026-27 DATE 30-07-2026 · 2026-08-03T17:00:00 Directorate of Local Bodies UP WARD NO. 19 | Not Disclosed | ₹20.7 L 0% vs est. | ₹20.7 L ★GAYATRI UPADHYAY | 1 | ACCEPTED - AOC |
| Construction of CC road from Virendra Bari house to Ramapan house in Ward No. 15 (Veer Savarkar Nagar).↗ 434/NPPK/2026-27 DATE 30-07-2026 · 2026-08-03T17:00:00 Directorate of Local Bodies UP WARD NO. 15 | Not Disclosed | ₹9.3 L 0% vs est. | ₹9.3 L M/S VIJAY LUXMI CONSTRUCTION | 2 | REJECTED - FINANCE |
| Under District Kushinagar, Construction of CC road from Gram Sabha Badgaon Rana Pratap Singh house to Belwania intersection, Lot No...↗ 11/SE RED Gorakhpur/Kushinagar/26-27 Dt 02/04/2026 · 2026-05-19T10:00:00 Director Cum Chief Engineer RED Kushinagar | ₹60.1 L | ₹59.5 L -1.1% vs est. | ₹70.0 L ★GAYATRI UPADHYAY | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 7 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.