/
Dilip Construction
VerifiedDILIP CONSTRUCTION
Public Preview E.E., Construction Division, P.W.D., Jaunpur •3 Authorities•20 Bids
Bid Lifecycle DistributionBy ₹ Value
₹2.4 Cr
₹1.6 Cr
₹1.8 Cr
Won (1)
₹2.4 CrFinance Rej (2)
₹1.6 CrTech/Scrutiny (1)
₹1.8 CrOutbid/Other (0)
₹0Awarded Value
₹2.4 Cr
9 won
Win Rate
47.4%
Avg. Deal: ₹26.5 L
Avg. Bid Size
₹35.2 L
across 20 tenders
Total Bids
20
state tenders
Annual Performance & Win Trajectory
33.9% Won
Value Captured: ₹2.4 Cr
Pool: ₹7.0 Cr
| Fiscal Year | Tenders Contested | Contracts Won | Annual Win Rate | Won Value (INR) |
|---|---|---|---|---|
| 2026 | 10 tenders | 4 wins | 40% | ₹6.3 L |
| 2025 | 10 tenders | 5 wins | 50% | ₹2.3 Cr |
Geographic Operating Footprint
Uttar Pradesh District Intensity
Hover or click district to filter tenders
Work Frequency:
0 Bids
Low
Medium
High
Highest
SULTANPUR
13 bids (5 won)
₹2.3 Cr
Won contracts E.E., Construction Division, P.W.D., Jaunpur
6 bids (4 won)
₹6.3 L
Won contracts Garrison Engineer Alipore
1 bids (0 won)
₹0
Unawarded Competitor Intelligence Radar
Competitor Entity ↕ | Shared Tenders ↓ | Rival Wins ↕ | Rival Won Value ↕ | Head-to-Head Duel | DILIP CONSTRUCTION Won Value ↕ |
|---|---|---|---|---|---|
1 M/s Lav Constructions #1 Arch-Rival Split outcome in shared bids | 4 shared | 1 Won | ₹49.9 L | ₹1.6 Cr 3 won | |
2 SKD GROUP OF CONSTRUCTION #2 Major Rival | 4 shared | 0 Wins | ₹0 | ₹91.1 L 2 won | |
3 M/S RAJ CONSTRUCTION Split outcome in shared bids | 3 shared | 1 Won | ₹66.0 L | ₹72.1 L 1 won |
Showing Top 3 Competitors (Capped Public Preview)
Sign in or upgrade to Pro to unlock the full co-bidding syndicate matrix and head-to-head win spreads across all shared tenders.
Tender History & Bid Outcomes
| Tender & Authority | Estimate ↕ | Contractor Quote ↕ | Winning Quote ↕ | Rank | Outcome Status |
|---|---|---|---|---|---|
| GE/ALP (8728) KOLKATA OF 2026-27↗ GE/ALP (8728) KOLKATA OF 2026-27 · 2026-09-01T16:00:00 E-IN-C BRANCH - MILITARY ENGINEER SERVICES Garrison Engineer Alipore | ₹24.3 L | — | Pending | — | UNDER EVALUATION |
| Special repair work on the link road from Kurebhar Phulona Road to the paved road via Kapil Tiwaris house Annutwari...↗ 2537/2A/2026-27 Date-19.05.2026 · 2026-06-02T18:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹27.6 L | ₹24.8 L -10% vs est. | ₹22.4 L M/S SHIVA CONSTRUCTION COMPANY | L5 | REJECTED - FINANCE |
| Renewal of LB Road from Km 165 left from Km 2 of Motigarpur Gosaisinghpur Road to Purushottampur Purushottampur Link Road↗ 2537/2A/2026-27 Date-19.05.2026 · 2026-06-02T18:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹11.4 L | ₹10.1 L -11.5% vs est. | ₹10.1 L RUDRAKSHA CONSTRUCTION | L2 | REJECTED - FINANCE |
| Construction of the missing link between Sadhapur link road and Baitikala Shafipur Shahpur link road under the Lambhua Assembly constituency↗ 2089/1Com-Su.A.Cir./2026-27 Date 23.05.2026 · 2026-05-30T10:00:00 Chief Engineer PWD Faizabad Zone SULTANPUR | ₹59.5 L | — | ₹48.4 L M/S VIJAY CONSTRUCTION | Tech Disqualified | REJECTED - TECHNICAL |
| fathi khurd anusuchit basti swe sahpur brahmn basti↗ 733/9A date 14-03-2026 · 2026-03-18T12:00:00 Chief Engineer PWD Varanasi Zone E.E., Construction Division, P.W.D., Jaunpur | ₹5.7 L | ₹3.4 L -39.4% vs est. | ₹3.4 L ★Dilip Construction | L1 | ACCEPTED - AOC |
Contractor Ledger Preview • Showing 5 of 20 Tenders
Historical Tender Ledger Capped
Sign in or upgrade to Contracq Pro to unlock the full bidding history, line-item quote variances against official estimates, winning quotes, and official BOQ downloads.